Showing posts with label commission quilt #1. Show all posts
Showing posts with label commission quilt #1. Show all posts

Monday, March 28, 2011

Stashbusting 2011 - Week 13

This past week was somewhat productive.  Not a lot of fabric used, but some.  Mainly it was  for the quilting class (0.65 yards) and for the scrappy quilt (0.42 yards).

My quilting machine did get fixed this week, but not until Saturday morning.  Thankfully, it was just thread caught in the bobbin that had caused the timing to get off.  That will teach me to use cheap Sulky thread instead of good quality thread.  I was trying to get the quilt quilted, so I wasn't picky with my thread and didn't want to wait for Superior to ship.  Serves me right...If I had just ordered the good thread and waited, I probably would have gotten the quilt done this past week anyway and wouldn't have broken the machine.  oh well...live and learn.

I also ended up buying fabric last week.  My cousin is having a baby this summer, so I picked out some nice, bright-colored fabric for the baby quilt.  Damages....5.25 yards.  There's 2 yards for background material and 13 fat quarters.  I only need about half of each fat quarter, but I wanted to get a good variety of colors..so I'll have some left over for another project.

So here's the numbers for this week:
Added This Week:       5.25 yards
Added Year to Date:    37.64 yards
Used This Week:         1.11 yards
Used Year to Date:      16.17 yards
Net Year to Date:        21.47 yards

Still haven't used as much as I have bought.  I find that I always buy about 1/4 yard extra for fabrics and then I count only what I actually use.  So even when I buy fabric for a quilt and make the quilt, I still have added to the "stash".  I have to really get moving on the scrap quilt to use up some of the excess! :-)

Monday, March 21, 2011

Goals - Week 12

Last week's goals:

Goals for Week 11:
- Test quilting panto on "Tumbler" quilt -- Completed
- Make 4 pinwheel blocks for quilt class -- Completed
- Sew "Starry Night" needlepoint and photograph -- I did do some sewing, but no photos.
- Complete quilt top for commission quilt -- Completed piecing this, but not quilted yet.
- Purchase backing material for commission quilt --Completed

This past week was very productive.  In less than a week, I got a complete quilt top made and ready for quilting.  Unfortunately, I ended up breaking part of my MegaQuilter sewing machine, so its in the repair shop and I won't be able to do the quilting on the commission quilt until I have the sewing machine back.


We also passed our house inspection this week, including the radon tests.  So now we just have to make sure the mortgage for the other people goes through.  We've started packing up a few things at this point, but part of us doesn't want to get too far down the packing road and then have something fall through.


We also checked out a rental property.  We've been having trouble finding a house rental because everyone wants at least a year lease, but we only need 6 months.  We don't really want an apartment because it will mean storage for everything.  However, an apartment may be the answer.  The house we looked at belongs to our builder's dad.  The layout is kind of wonky, but the biggest worry is that there is no central air and the place smells kind of musty/moldy.  Since I have pretty bad allergies, we really don't know whether the place will bother me or not.  If it does...it will be a VERY long 6 months.


Goals for week 12:
- Sew "Starry Night" needlepoint and photograph --
- Wash fabric for cousin's baby quilt --
- Clean up and pack extra fabric/quilting patterns.

Sunday, March 20, 2011

Stashbusting 2011 - Week 12

This week was a fairly productive week.  I finished up a quilt top for a co-worker, but then I ended up buying backing material (1.75 yards).  I get to count it as used though because its already washed, pressed and loaded onto my quilting frame.


Now...the quilt was going to be quilted this weekend, however I had a little "incident" with the MegaQuilter.  So Friday I tested out a new pantograph on a practice quilt sandwich and everything was fine.  I loaded the backing for the commission quilt and started stitching a straight guide line across the top of the backing and batting.  About 15" in, I heard a pop and saw my needle was broken.  I thought it was just a bad needle.  So I put a new one in, went to pull up the bobbin thread, and the bobbin snapped the tip off the needle.  When I opened it up and looked at the bobbin area, it was clear something was wrong.
I took the MegaQuilter into the local sewing repair shop, and they said that somehow either thread or a portion of the first broken needle got jammed between two parts of the bobbin race and threw the timing off horribly.  Thankfully it can be fixed, but it could take 2 weeks to get the MegaQuilter back.  So much for getting the quilt done this week. ;-(

Good news is that it can be fixed though.

So between the backing and prepping the binding for the commission quilt I ended up using some yardage this week.  Here's the damage:

Added This Week:       1.75 yards
Added Year to Date:    32.39 yards
Used This Week:         2.22 yards
Used Year to Date:      15.05 yards
Net Year to Date:        17.33 yards

Wednesday, March 16, 2011

Flimsy!

Yay!  Finished up piecing the top for the commission quilt for my co-worker's daughter.


100_0502

Sunday, March 13, 2011

Stashbusting 2011 - Week 11

This week was a very productive week on the quilting front.  I did have to add some fabric to the stash this week, but its for a commission quilt and will be used up fairly quickly (at least most of it).

I finished the log cabin blocks for my quilt class.  Here they are laid out the pattern that they will be used.

Log Cabin Blocks

I also used some fabric for the 2nd week of the quilt class to complete 4 pinwheel blocks.  The instructor was also able to show me how to do the "twirl" thing with the seams on the back of the pinwheel blocks.  I've wanted to do it, but never could quite figure it out.

Pinwheel Blocks

Pinwheel Back

I was also able to cut ALL the fabric for a commission quilt on Friday evening and got a whole bunch of square-in-square blocks done along with prepping the applique pieces for the child's name.  The "requirements" of the quilt were that it was super soft & cuddly, used Dora and Diego in it somewhere, and that the child's name was on the quilt somehow.  The left the design and fabric choices completely up to me.  I'm not going to show the entire plan just yet, but I'll hopefully get the entire top done this week so there will probably be pictures next week.

100_0495

100_0497

100_0498

So for me...I was actually able to use a lot of fabric this week, which is unusual.  Here's the numbers:
Added This Week:       5.75 yards
Added Year to Date:    30.64 yards
Used This Week:         4.40 yards
Used Year to Date:      12.83 yards
Net Year to Date:        17.81 yards


I think I need to start making some more blocks for my scrappy quilt to use up some stash. ;-)