Showing posts with label Quiltathon. Show all posts
Showing posts with label Quiltathon. Show all posts

Sunday, January 11, 2009

January Quiltathon - Sunday

I didn't get as much sewing done as I would have liked today, but I did get some done. The morning started out with having to clear the driveway of 7.5" of snow. Since we don't usually get a ton of snow in the winter (typically just one or two good snowfalls), we don't own a snow-thrower and the clearing is done the old fashioned way....brute force. My husband and I were out for about an hour clearing the snow so that he could go snowboarding and I could go get a facial (my one vice that I really allow myself).

Once I got back from the facial, I put the crock pot on and started the laundry. I had to press all those little squares that I had sewn last night before I could put them into the 9-patches, so that took a while. Eventually I did get everything sewn together. I have a total of 30 9-patches that will be a finished size of 4.5". I still need to press the white material for the setting squares, but that will be another day.


Hope everyone else had a good quilting weekend!

Saturday, January 10, 2009

Quiltathon 2009 - Saturday Evening

I was able to get some sewing done today despite having to do a lot of errands and help put together a bookcase. So the first two pictures are an experiment of mine. I'm a big tea fan, but I do not have a tea cozy to keep my teapot warm. So I decided to try to make one with some fat quarters I had laying around. I also decided that it would be a good thing to practice my free-motion quilting on. I know it looks a little funny, but I'm sure it will work. Today I was able to put the two halves together and to machine sew part of the binding on the bottom. I was going to machine sew the entire binding, but its a little difficult to fit under the machine, so I'm just going to do it by hand.


Now here are all the little squares I had cut out earlier this morning. I'm about halfway through the last set and its time to clean the machine, put a new needle in and all that.... so its waiting until tomorrow to get finished. ;-) I have plenty of sets of 3 to press tomorrow too, but you can see the fairly large pile of sewn pieces. Right there is about 80 of the sets of 3. After I get them all nicely pressed, it will be time to match all the those seams and make 9 patches.

On the weather side....it looks like we're going to be having a lot of snow. The snow started around 7:30 and its only gotten heavier and isn't supposed to stop until tomorrow at lunchtime. Then it will be time to move all that snow! Yuck!

Quiltathon 2009 - Saturday Update

The quiltathon is on! While I did get up early this morning to get to cutting fabric, the majority of the cutting got delayed a bit. My husband insisted that the Christmas tree come down this morning, so we spent about an hour or so taking down the tree and boxing everything up. Since Mother Nature is deciding that Albany should be in the Golden Snowball Race this year, we had to do our grocery shopping since we have a winter storm warning in effect from 4pm until tomorrow afternoon. We're expecting to get about 8 inches of snow.

I did however get some "quilty" stuff done. I dropped off the "Fifty-Four Forty or Fight" quilt to be quilted. I also did get the colored fabric cut for the "Rainbow Patch" quilt. Here's some before and after pictures from the cutting:


I'm hoping that I'll be able to get a few of these sewn this afternoon before I quit for the day. Happy Quilting!